Identification of fauna and flora species in the area of influence of CSP
June
Obtainment of a 10-year granting for water consumption for CSP operation
2009
June
Beginning of the procedure to obtain a Preliminary License for CSP – Preparation of EIS/EIR
Public hearings to obtain the Preliminary License – Presentation of the project to the communities and stakeholders
December
Beginning of the seedling production in the Forest Nursery from the seeds collected in the construction site
Rescue of fauna in CSP area and reintroduction in the Pecém Ecological Station
Obtainment of the Preliminary Environmental License valid until December 4, 2010
2010
May
Obtainment of the Installation License for CSP’s administrative construction site
Production of seedlings in the Forest Nursery from the seeds collected in the construction site (up to December)
2011
January
Preparation of the Environmental Control and Monitoring Plan (EMCP)
February
Beginning of the planting of 150,000 native species seedlings for the recovery of 206 hectares in the Pecém Ecological Station
March
Obtainment of the Installation License for earthwork, protection drainage, fences, temporary streets and construction sites
June
Obtainment of the Installation License for the steel mill’s location and design
2012
June
Beginning of Environmental Education activities
October
Obtainment of granting of water supply for the construction
2013
February to May
Planting of 22,619 native species seedlings for the recovery of 15 hectares in the Areas of Permanent Preservation of Lagoa do Bolso
Planting of 148,350 native species seedlings for the recovery of 191 hectares in CSP’s internal area
June
Publication of a logbook with the fauna and flora recovery works in the region
Inauguration of CSP’s internal Forest Nursery
Launch of the Sustainability Education Program (PES)
September
CSP is granted the 1st Certificate of Forest Restoration Compliance in the State of Ceará, issued by the State Environmental Authority (Semace)
October
Conduction of the hydrogeological study in the area of influence of CSP
November
Obtainment of the Preliminary License for a 230-kV electric power transmission line connecting CSP substation to the substation
2014
January
CSP is granted the 2nd Certificate of Forest Restoration in the State of Ceará for an area of 14.9 hectares in the Lagoa do Bolso region
February
Obtainment of the Installation License for the transmission line connecting the internal substation to the main Chesf substation, issued by Semace
2015
March
CSP is granted the FIEC Award for Environmental Performance in the “Integration with Society” category
April
Obtainment of the environmental authorization for pre-operational tests of production units and auxiliary areas.
May
CSP is granted the 3rd Certificate of Forest Restoration in the State of Ceará for an area of 191 hectares in CSP’s internal area
June
Completion of a 2-year environmental monitoring in the area surrounding CSP prior to its operation
June
Beginning of workshops on material reuse, selective waste collection, horticulture, native tree planting, ecological defenses, among others
October
Obtainment of temporary environmental authorization to release treated industrial wastewater into sector 1 of the IPCP macro-drainage channel during CSP pre-operational tests
Obtainment of environmental authorization to transport iron ore and coal from the Port of Pecém to the steel mill’s raw materials storage yards
2016
August
Beginning process of obtaining the operating license